防水是房屋裝修中一項重要的工程,因此在防水施工過程中一定要注意,否則日后出現漏水現象的話處理起來非常麻煩。那么,下完雨幾天能做樓頂防水呢?做樓頂防水要注意什么呢?下面小編就帶大家一起來了解了解。
Waterproof is an important project in house decoration, so we must pay attention to it in the process of waterproof construction, otherwise it will be very troublesome to deal with water leakage in the future. So, how many days can the roof be waterproof after the rain? What should we pay attention to when making the roof waterproof? Now let's take you to understand.
下完雨一般來說需要5到7天的時間才能開始做樓頂的防水,也就是需等到樓頂水份不超過9%的時候才能開始施工。檢驗水份是否合格的話,可以在晚上時用一塊塑料膠布將水泥的基本給蓋住,若第二天沒有在膠布上看到水珠,則代表水份沒有超標可以開始施工。
Generally speaking, it takes 5 to 7 days after the rain to start the waterproof of the roof, that is, it needs to wait until the water content of the roof does not exceed 9% to start the construction. If the water content is qualified, you can cover the basic cement with a piece of plastic tape at night. If you don't see water drops on the tape the next day, it means that the water content does not exceed the standard, and you can start construction.
1、樓頂防水在施工之前,要先做好技術準備工作,也就是說在屋面工程施工以前,施工單位需要組織技術管理相關人員對屋面工程圖紙進行會審,掌握好其中的細部構造與相關技術要求,然后再根據樓頂的實際情況來編制施工方案。這樣可以避免在施工后留下缺陷,以免日后出現需返工的情況,同時還能防止工作遺漏、錯亂等影響到工程的質量。
1. Before the construction of roof waterproofing, technical preparations should be made first, that is, before the construction of roof engineering, the construction unit needs to organize relevant technical management personnel to jointly review the roof engineering drawings, master the detailed structure and relevant technical requirements, and then prepare the construction scheme according to the actual situation of the roof. This can avoid leaving defects after construction, so as to avoid rework in the future, and at the same time, it can prevent work omission, disorder and other factors from affecting the quality of the project.

2、屋頂的防水工程必須由防水專業隊伍來施工,絕對不能讓沒有資質等級證書的單位或是非防水專業隊伍來對屋面工程的防水進行施工,在施工之前必須要認真地檢查施工人員的上崗證。另外,屋頂房屋在施工過程中,施工單位需要按施工工序、層次來進行質量的自檢、自查、自糾,同時還需做好相關的施工記錄,而監理單位則需做好每步工序的驗收工作。
2. The waterproof works of the roof must be constructed by a waterproof professional team. Units without qualification certificates or non waterproof professional teams must not be allowed to construct the waterproof works of the roof. Before construction, the work licenses of construction personnel must be carefully checked. In addition, during the construction of roof houses, the construction unit needs to carry out self inspection, self inspection and self correction of quality according to the construction process and level, and also need to make relevant construction records, while the supervision unit needs to do a good job in the acceptance of each process.
以上就是關于下完雨幾天能做樓頂防水以及做樓頂防水要注意什么的全部內容,希望對大家有所幫助http://www.chateaubeaumet.com
The above is all about what you should pay attention to when you can do roof waterproofing after a few days of rain. I hope it will be helpful to you http://www.chateaubeaumet.com
The above is a detailed introduction about roof waterproofing in Jinan. I hope it will help you If you have any questions, please contact us We will provide you with professional service http://www.chateaubeaumet.com